Call Us

+255 768 223 777

Email Us

office@iaestz.com

Business Hours

08:00AM - 05PM Monday to Friday

Power Systems

Power Systems

  • Substation at DAWASA Substation Lower Ruvu.(2011)
  • Supply and Installation of LV Panel for compressor room at Tanzania Distillers Limited. (2014)
  • Supply and Installation of 240mm? x 4c, 120mtr power cable for compressor at Tanzania Cigarette Public Limited Company. (2015)
  • Supply, Installation, Testing and Commissioning of the Automatic Power factor correction Equipment 100kvar or 12steps with accessories required for complete installation at BOT Mbeya. (2017)
  • Supply and installation of Electrical cables fo 1MW Gas Engine Generator Tanzania Cigarette Public Limited Company. (2017)
  • Supply and installation of Electrical cables for 1MW Gas Engine Generator Tanzania Cigarette Public Limited Company. (2017)
  • Supply and Installation of Industry Ventilation Fan at Tanzania Cigarette Public Limited Company's Ware House. (2018)
  • Improvement of Earthing and Grounding system at Tanzania Cigarette Public Limited Company. (2018)
  • Installation and Commissioning of 2500 kVA Transformer; Oil Top up and Filtration at Tanzania Portland Cement PLC. (2018)
  • Design, Installation and Commissioning of Automatic Power Factor units 250kvar, 150kvar at Tanga Cement Public Limited Company and Tanga Fresh Limited. (2019)
  • Erection of 3.3 KV circuit breaker at Tanzania Portland Cement PLC. (2019)
  • Supply and Installation of Power Energy Meter - PAC3200 SIEMENS at Tanzania Cigarette Public Limited Company. (2019)
  • Replacement of Wooden Poles with Galvanized poles at Tanzania Portland Cement PLC. (2019)

Power Systems